Halston carry out monthly environmental monitoring at 108 hectare datacentre construction site in Co. Meath. The purpose of the environmental works is to monitor, trend and assess the impact of construction activities on the receiving environment…
Projects
Environmental Monitoring and Assessment
Halston undertake licence compliance works for various categories of licensed /permitted facilities throughout Ireland. We have extensive experience in a wide range of aspects of environmental monitoring…
Environmental Due Diligence Surveys
We have completed numerous environmental due diligence (EDD) surveys for industrial site owners, property developers, financial institutions and corporate insolvency firms. EDD assists clients to identify potential environmental liabilities and minimise risk prior to site acquisition…
Pharma Occupational Hygiene
The purpose of the survey was to collect representative exposure data to provide analytical information about exposures to airborne substances in the workplace and to assess the requirement for additional control measures. The occupational hygiene site survey was undertaken…
Licences, Permits and Approvals
Halston has prepared numerous environmental permits and licences. These include EPA Integrated Pollution Control (IPC) Licence Applications, EPA Industrial Emissions (IE) Licence Applications, EPA Waste Licence Applications…
Waste Management
The project involved planning and development of a brownfield site at to provide for the safe treatment and recovery of healthcare waste. The proposed treatment technology comprised shredding and sterilisation of the waste and production of refuse derived fuel (RDF) suitable for use…
Service Stations
Halston have completed Phase 1 and 2 site investigation and risk assessment works on a portfolio of over 50 petrol service stations in Ireland. Works at the sites have included air rotary drilling, percussion drilling, installation of groundwater monitoring wells, soil and…
Grid Connected Energy Storage
The project comprises development of 100MW battery energy storage system (BESS) plants on each of two separate 4 acre sites capable of providing system support services to the national electricity grid…
Power Generation
Halston were responsible for preparation of a planning application and EPA industrial emissions licence application supported by an environmental impact statement (EIS) for a 350MW mid merit Gas Fired Power Station…